UPS company - SUS project for InteliSysNT

Malaysia, Kuala Lumpur Control and power solutions

3 x SUS + InteliMainsNT

This project and single line in the initial state does not look complicated, appearance is standard MINT (Multiple INTernal) + InteliMainsNT application. The ComAp Systems UK SUS project for the InteliSysNT range of controllers was a 12 month development in partnership with a UPS company, providing a quick start generator solution.
The system operates as a non excitation start arrangement providing electrically connected multiple generators running and loaded in 6 – 10 seconds. The project was initially tested on two 100kVA generator units of different engine plus alternator configuration followed by two 1250kVA diesel CAT generators. Various and rigorous testing were concluded and a final version was issued for an installation to a site with three Mitsubishi powered generator sets. The control system was built and commissioned on site by ComAp Systems engineers.
 

top page