Control and power solutions |
3x MINT + "H" configuration
The conversion of an existing power generation system from a "H" configuration to incorporate an additional new third engine and the replacement of obsolete PLC.
The final solution was made to replace all the existing products with the NT family, as it was a quicker and more cost effective solution then making PLC software changes. New NT solution does not require an external PLC. All power cables and controls changed plus commissioning were done in 7 days.